Installation



  • Foundation preparation and casting

  • Setting of the lifting jacks

  • All connection are bolted

  • First ring of the tank installed

  • Second ring in place

  • The tank is jacked in stage & the next ring constructed at ground level

  • Punching for nozzle on site

  • Roof installation: special jacking

  • Increase safety and rapid build time achieved through the modular build

  • Increase safety and rapid build time achieved through the modular build