PROJECTS

Thasae Cooperatives Palm Oil Mill, Chumphon Province

Tank Diameter 24.73 m.     Tank Height 9.68 m.    

Tank Capacity 4,403 m3      Quantity 2 Tanks    

Gas Mixing System 18.5 kW 2 Units/Tank


Prachongkij Palm Oil, Ranong Province

Tank Diameter 25.15 m.     Tank Height 9.68 m.     

Tank Capacity 4,700 m3     Quantity Tanks    

Gas Mixing System 18.5 kW 2 Units/Tank


Thana Palm (Palm Harvest Co., Ltd.), Suratthani Province

Tank Diameter 28.15 m.     Tank Height 11.08 m.    

Tank Capacity 6,584 m3      Quantity 3 Tanks    

Gas Mixing System 18.5 kW 3 Units/Tank


Thong Mongkol Palm Oil, Prachuap Kirikhan Province

Tank Diameter 28.15 m.     Tank Height 11.08 m.    

Tank Capacity 6,584 m3      Quantity 3 Tanks    

Gas Mixing System 18.5 kW 3 Units/Tank


Biogas power plant from Napier glass, Prachuap Kirikhan Province

Tank Diameter 25.616 m.     Tank Height 9.74 m.    

Tank Capacity 5,020 m3      Quantity 1 Tank


Siam Modified Starch Co., Ltd., Buriram Province

Tank Diameter 11.1 m.     Tank Height 12.60 m.

Tank Capacity 1,100 m3    Quantity 1 Tanks

Gas Mixing System 18.5 kW 1 Units/Tank


AMATA WATER CO., LTD., Chonburi Province

Tank Diameter 19.63 m. Tank Height 5.50 m.

Tank Capacity 1,575 m3  Quantity 1 Tanks


Lactasoy Co.,Ltd. (Factory)., Prachinburi Province

Glass‐Fused‐to‐Steel Bolted Tanks with Geodesic Dome Roof

Tank Diameter 12.80 m. Tank Height 12.60 m.

Tank Capacity 1,612 m3  Quantity 2 Tanks


Green Energy Network Co., Ltd.

(RedBull , Kamphaeng Phet Province)

Glass‐Fused‐to‐Steel Bolted Tanks with Double Membrane Gas Holder

Tank Diameter 22.20 m. Tank Height 11.20 m.

Tank Capacity 4,300 m3  Quantity 1 Tanks

Gas Mixing System 18.5 kW 2 Units/Tank


AMATA WATER CO., LTD., AMATA CITY ,Rayong Province

Tank Diameter 19.63 m. Tank Height 5.50 m.    

Tank Capacity 1,575 m3  Quantity 2 Tanks   

Tank Diameter 27.32 m. Tank Height 5.50 m.    

Tank Capacity 3,050 m3  Quantity 1 Tanks 


Prompt Power Co., Ltd.

CPF : Chokchai, Nakhon Ratchasima province.

Membrane installation



Siam modern palm : Krabi province.

Gas holder installation



 


Visitors: 19,244